The aluminum hull for Perini Navi’s project 2218, a 197-footer, was righted in March. The yacht marks the second contract for its new 60m sloop series. This slideshow takes you through the painstaking process of turning the hull from the upside-down position, which is how it was built, to right-side up.
Delivery is set for 2014.
[pb_slideshow group=”37″]
Leave a Reply